Browse through our gallery of works. Use the arrows to skip forwards and backwards, or let the slideshow scroll through for you.
-
Concrete slab for hot tub or jacuzzi in townhouse backyard.
-
-
Supervising excavation works for bio-retention pit/drain at Loganholme.
-
Bondek slab concrete poured.
-
Driveway set up ready for pour in Austinville.
-
Retaining wall steel for up to 1.2m high core fille block wall.
-
-
"French Exposed" close up. Light washed, blue stone for maximum grip while being kind to bare feet.
-
"French Exposed" driveway at Austinville
-
Removal of kerb and reinstatement of VXO to help reduce bottoming out of low vehicle.
-
This mix was supplied by Hanson (call 132662), and it is possibly called Grey Ghost.
-
Exposed aggregate pathway.
-
Prepped topping slab inside Robina Town Centre for renovation work to be carried out. Helped Tony Conforti do this.
-
About 100m of pump line was used to get the concrete into the shopping centre for the topping slab.
-
Exposed Aggregate Surrounds
Sawn control joint in pathway.
-
Exposed Aggregate Surrounds
-
Exposed Aggregate Surrounds
-
Exposed Aggregate Surrounds
-
A before shot of the house slab for Brent at Bonogin.
-
Helped Brent Gray pour and finish this house slab at Bonogin.
-
Prepped steel for suspended stairs.
-
Prepped steel for suspended stairs.
-
Prepped steel for suspended stairs.
-
Plain concrete driveway extension for more parking and turning area.
-
Black coloured & plain concrete driveway.
-
Black coloured concrete driveway.
-
Black coloured & plain concrete driveway.
-
Stormwater headwall base prepped for pouring concrete.
-
Stormwater headwall base poured.
-
Suspended Concrete Stairs
-
Suspended Concrete Stairs
Suspended concrete stairs for tiling.
-
Suspended Concrete Stairs
-
Suspended Concrete Stairs
-
Sewer pit wall steel prepped.
-
Helped Reno Simpson do these house surrounds. Patio, broom finish.
-
-
Helped Reno Simpson do this driveway. Exposed aggregate finish.
-
Closer shot of the exposed aggregate.
-
-
-
Ground finish. Grinding was done by Browne Concrete Services.
-
Wall steel prepped for sewer pit.
-
Steel prepped for sewer pit caps.
-
-
A long stretch of culvert base prepped ready for pouring.
-
Pad footing with tie down bolts poured insitu.
-
-
-
-
-
-
Garage slab topped for a renovation.
-
Like this:
Like Loading...